Owner manual

27
B. Deburring
Useaknife,plasticpipedeburringtool,orfiletoremoveburrsfrom
theendof small diameter pipe. Be suretoremoveallburrsfrom
aroundtheinsideaswellastheoutsideofthepipe.Aslightchamfer
(bevel)ofabout10°-1shouldbeaddedtotheendtopermiteasier
insertionofthepipeintotheendofthefitting.Failuretochamferthe
edgeofthepipemayremovecementfromthefittingsocket,causing
thejointtoleak.
STEP B
C. Test dry t of the joint
Taperedttingsocketsaredesignedsothataninterfacedtshould
occurwhenthepipeisinsertedabout1/3to2/3ofthewayintothe
socket.Occasionally,whenpipettingdimensionsareatthetolerance
extremes,itwillbepossibletofullyinsertdrypipetothebottomof
thettingsocket.Whenthishappens,asufcientquantityofcement
mustbeappliedtothejointtollthegapbetweenthepipeandtting.
Thegapmustbelledtoobtainastrong,leak-freejoint.
D. Inspection, cleaning, priming
Visually inspect the inside of the pipe and tting sockets and
removealldirt,greaseormoisturewithacleandryrag.Ifwiping
fails to clean the surfaces, a chemical cleaner must be used.
Checkforpossibledamagesuchassplitsorcracksandreplace
if necessary.
Depth-of-entry
Markingthedepthofentryisawaytocheckifthepipehas
reachedthebottomofthefittingsocketinStepF.Measure
thefittingdepthandmarkthisdistanceonthepipeO.D.You
maywanttoaddseveralinchestothedistanceandmakea
secondmarkastheprimerandcementwillmostlikelydestroy
your first one.
Applyprimertothesurfaceofthepipe and tting socket with
anaturalbristlebrush.Thisprocesssoftensandpreparesthe
PVCorCPVCforthesolventcementingstep.Movequicklyand
withouthesitationtothecementingprocedurewhilethesurfaces
arestillwetwithprimer.
E. Application of solvent cement
Apply the solvent cement evenly and quickly around the
outsideofthepipeatawidthalittlegreaterthanthedepth
ofthettingsocket.
• Applyalightcoatofcementevenlyaroundtheinsideofthe
ttingsocket.Avoidpuddling.
• Applyasecondcoatofcementtothepipeend.
STEP E
F. Joint assembly
Workingquickly,insertthepipeintothettingsocketbottomand
givethepipeorttinga1/4turntoevenlydistributethecement.
Donotcontinuetorotatethepipeafterithashitthebottomofthe
ttingsocket.Agoodjointwillhavesufcientcementtomakea
beadallthewayaroundtheoutsideofthettinghub.Thetting
willhaveatendencytoslidebackwhilethecementisstillwet
soholdthejointtogetherforabout15seconds.
STEP F
G. Cleanup and joint movement
Removeallexcesscementfromaroundthepipeandttingwitha
drycottonrag.Thismustbedonewhilethecementisstillsoft.
Thejointshouldnotbedisturbedimmediatelyafterthecementing
procedure,andsufcienttimeshouldbeallowedforpropercuring
of the joint. Exact drying time is difcult to predict because it
dependsonvariablessuchastemperature,humidityandcement
integrity.Formorespecicinformation,youshouldcontactyour
solventcementmanufacturer.
STEP G