Technical information

A. O. Smith Water Products Company Service Handbook
Irving, Texas 2000©
Training Department
28
STEP 11. 24 VAC CHECK
Each terminal of pressure switch to ground; bottom (B) first then top (T) to ground next.
IF THEN
blocked inlet (B) to gnd does not have 24 VAC check
w
blocked inlet (B) to gnd does have 24 VAC continu
e
blocked inlet (T) to gnd does not have 24 VAC replace
blocked inlet (T) to gnd does have 24 VAC continu
e
blower prover (B) to gnd does not have 24 VAC check
w
blower prover (B) to gnd does have 24 VAC continu
e
blower prover (T) to gnd does not have 24 VAC
g
o to S
t
blower prover (T) to gnd does have 24 VAC replace
TROUBLESHOOTING
STEP 11 - 24 VAC CHECK
STEP 12 - 24 VAC CHECK THROUGH PRESS SWITCHES
STEP 12. CONTINUATION OF 24 VAC CHECK THROUGH PRESS SWITCHES
Tank calling for heat
Blower on (See Table on Page 32 for Opening/Closing Pressures).
IF... THEN
check for po
s
air tubin
g
is
c
replace swit
c
blower prover (T) to gnd does have 24 VAC continue.
low gas press (B) to gnd does not have 24 VAC check wire co
n
low gas press. (B) to gnd does have 24 VAC continue.
check suppl
y
connection t
u
replace swit
c
low gas press (T) to gnd does have 24 VAC continue.
check wire c
o
blower prove
r
blocked outlet (B) to gnd does have 24 VAC continue.
check for blo
check for po
s
replace swit
c
blocked outlet (T) to gnd does have 24 VAC continue to St
e
blocked outlet (B) to gnd does not have 24 VAC
blocked outlet (T) to gnd does not have 24 VAC
if BTH 120 o
r
blower prover (T) to gnd does not have 24 VAC
low gas press (T) to gnd does not have 24 VAC
(BTH 120 and 250 only)