Installation manual

ANNUAL SERVICE
THIS GAS APPLIANCE MUST BE SERVICED
EVERY TWELVE MONTHS BY A QUALIFIED
GAS ENGINEER.
See "SAFETY NOTICES" ref coal set page 4.
Step 1 Isolate the gas supply to the fire using
the gas cock supplied at installation.
Step 2 With the appliance cold, open the main
door by turning the handle through 180°
degrees.
Step 3 Carefully remove and clean the fuel effect
coals of any soot deposits with a soft
brush.
Step 4 Inspect chimney and flue terminal ensuring
they are in good working order and sweep
as nesseccery to ensure no debris blocks
the
flue. Please note periodic chimney
sweeping is vital to gas fire maintenance.
Step 5 Remove any soot deposits from inside
the fire using a vacuum cleaner.
Step 6 Inspect the pilot assembly to ensure
that it is clean, unobstructed and in
good order.
Step 7 Check system for gas soundness
Step 8 Replace the coal set as described in
"arranging the coals".
Step 9 Carry out spillage test as per instructions
on page 15.
CLEANING OUTER SURFACES
To clean the outside first the appliance must be
cold.
The outside finish of the fire is a durable high
temperature paint, this will give off a slight odour
during the first few days of operation. It is best
cleaned by using a soft brush. Do not allow
moisture to remain on the fire whilst cold or surface
rust may occur.
CLEANING DOOR GLASS
To clean the door glass the appliance must be cold.
Open the main door by turning the handle through
180° degrees. When cleaning the inside of the door
glass care should be taken that no damage is caused
to the door sealing gasket.
# PLEASE NOTE
FIREDOOR HANDLE
Please note the fire has no thread to secure it to
the locking spindle.
The handle is designed to be a loose fit to ensure
the handle is not left in the door when the fire is
running.
This is a safety issue to ensure the fire door
remains shut and can not be inadvertently opened
when the fire is running.
20 Becton Bunny & Becton 7 MK2 Gas stoves
SERVICING