Instructions / Assembly

AC-913 Instructions
Air Conditioners Central and Portable: For initial application,
place two (2) or more tablets in the condensate drain tray for
each ton (12,000 BTU) or air conditioning. Position the tablet(s)
at a point furthest from the drain to assure complete
treatment. Additional applications should be done monthly at
the rate of one tablet per ton.
Dehumidifiers Console and Central: Drop two (2) to four (4)
tablets in the water tank. Repeat application each time tank is
empties. Periodically rinse tank and wipe clean.
Humidifiers Console and Central: Drop two (2) to four (4)
tablets in the reservoir. Repeat every four to six weeks.
Periodically check for accumulations and adjust dosage as
necessary depending upon humidification levels and
temperature.
Refrigerators: Drop one tablet into the condensate drain tray.
Position the tablet so that the condensing water drips over it.
Rinse and wipe pan after emptying. Repeat application.

Summary of content (1 pages)