User manual

ADCP-75-154 • Issue 3 • August 2006
Page 5
© 2006, ADC Telecommunications, Inc.
2 SYSTEM INSTALLATION
2.1 Installation Overview
Installation consists of three main steps:
1. Installing the MHU: mechanical attachment, coaxial cables, ground cable.
2. Installing the Bias-T: mechanical attachment, coaxial cables, power cable.
3. Installing the PDU: mechanical attachment, operation power, and alarms.
2.2 Installing the Masthead Unit
U-bolts are provided for mounting the MHU. Figure 6 provides an exploded view. The kit may
be used for tube diameter 30-140 mm.
Figure 6. MHU Long Bolt Mounting Bracket Kit Components
16775-C
ClearGain
ANY ClearGain MHU
(DETAILS MAY VARY)