ML-82 (Gas - DSI /Steam Models) Installation Manual WARNING: For your safety the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury or death. AVERTISSEMENT: Assurez-vous de bien suivre les instructions données dans cette notice pour réduire au minimumle risque dincendie ou dexplosion pour ou éviter tout dommage matériel, toute blessure ou la mort.
Retain This Manual In A Safe Place For Future Reference American Dryer Corporation products embody advanced concepts in engineering, design, and safety. If this product is properly maintained, it will provide many years of safe, efficient, and trouble-free operation. ONLY qualified technicians should service this equipment. OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment or specified in the installation/operators manual included with the dryer.
IMPORTANT YOU MUST DISCONNECT and LOCKOUT THE ELECTRIC SUPPLY and THE GAS SUPPLY or THE STEAM SUPPLY BEFORE ANY COVERS or GUARDS ARE REMOVED FROM THE MACHINE TO ALLOW ACCESS FOR CLEANING, ADJUSTING, INSTALLATION, or TESTING OF ANY EQUIPMENT per OSHA (Occupational Safety and Health Administration) STANDARDS. CAUTION LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION. VERIFY PROPER OPERATION AFTER SERVICING.
FOR YOUR SAFETY DO NOT DRY MOP HEADS IN THE DRYER. DO NOT USE DRYER IN THE PRESENCE OF DRY CLEANING FUMES. WARNING UNDER NO CIRCUMSTANCES should the door switch or the heat circuit devices ever be disabled. WARNING The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY or FIRE COULD RESULT. IMPORTANT PLEASE OBSERVE ALL SAFETY PRECAUTIONS displayed on the equipment and/or specified in the installation/operator's manual included with the dryer.
Table of Contents SECTION I IMPORTANT INFORMATION ............................................................................... 3 A. Receiving and Handling ............................................................................................................... 3 B. Safety Precautions ...................................................................................................................... 4 SECTION II SPECIFICATIONS/COMPONENT IDENTIFICATION .................................... 6 A.
SECTION V WARRANTY INFORMATION .............................................................................. 36 A. Returning Warranty Card(s) ...................................................................................................... 36 B. Warranty .................................................................................................................................. 36 C. Returning Warranty Part(s) .......................................................................................
SECTION I IMPORTANT INFORMATION A. RECEIVING and HANDLING The dryer is shipped in a protective stretch wrap cover with protective cardboard corners and top cover (or optional box) as a means of preventing damage in transit. Upon delivery, the dryer and/or packaging, and wooden skid should be visually inspected for shipping damage. If any damage whatsoever is noticed, inspect further before delivering carrier leaves. Dryers damaged in shipment: 1.
B. SAFETY PRECAUTIONS WARNING: For your safety, the information in this manual must be followed to minimize the risk of fire or explosion or to prevent property damage, personal injury, or loss of life. WARNING: The dryer must never be operated with any of the back guards, outer tops, or service panels removed. PERSONAL INJURY or FIRE COULD RESULT. 1. DO NOT store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. 2.
WARNING: DO NOT dry mop heads. Contamination by wax or flammable solvent will create a fire hazard. WARNING: DO NOT use heat for drying articles that contain plastic, foam, sponge rubber, or similarly textured rubberlike materials. Drying in a heated basket (tumbler) may damage plastics or rubber and also may be a fire hazard. 7. A program should be established for the inspection and cleaning of lint in the burner area, exhaust duct work, and area around the back of the dryer.
SECTION II SPECIFICATIONS/COMPONENT IDENTIFICATION A. SPECIFICATIONS Steam Gas BASKET (TUMBLER) DIAMETER BASKET (TUMBLER) DEPTH BASKET (TUMBLER) MOTOR BLOWER MOTOR DOOR OPENING (DIAMETER) BASKET (TUMBLER) VOLUME DRYERS PER 20’/40’’ C ONTAINER DRYERS PER 45’/48’ TRUCK VOLTAGE AVAILABLE APPROX. WEIGHT (UNCRATED) APPROX. WEIGHT (CRATED) HEAT INPUT AIRFLOW INLET PIPE SIZE VOLTAGE AVAILABLE APPROX. WEIGHT (UNCRATED) APPROX. WEIGHT (CRATED) AIRFLOW AIR CONNECTION STEAM COMSUMPTION 375 lbs/hr 170.
Specifications ML-82 (Gas and Steam ONLY) NOTE: ADC reserves the right to make changes in specifications at any time, without notice or obligation.
B. COMPONENT IDENTIFICATION 1. Dryer Front View Illus. No.
2. Dryer Rear View Illus. No. 1 2 3* 4 5 6 7 8 * Description Heating Unit 1/8 (3.175 mm) Compressed Air Supply Inlet (behind Electric Service Relay Box for Steam Models ONLY) Electric Service Relay Box Tumbler Bearing Mount Assembly Idler Bearing Mount Assembly Basket (Drive) Motor Assembly (for Reversing Models ONLY) Blower Motor Assembly Dryer Exhaust Electric service connections for gas models and steam models are made in this box.
SECTION III INSTALLATION PROCEDURES Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.1LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electrical Code) or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P.
B. UNPACKING/SETTING UP Remove protective shipping material (i.e., plastic wrap and optional shipping box) from dryer. IMPORTANT: Dryer must be transported and handled in an upright position at ALL times. The dryer can be moved to its final location with or without the skid attached. To unskid the dryer, locate and remove the four (4) bolts securing the base of the dryer to the wooden skid.
C. DRYER ENCLOSURE REQUIREMENTS Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm), 18-inches (45.72 cm) or more is recommended for ease of installation, maintenance, and service, above the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not extend more than 4-inches (10.
IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is required. Dryers may be positioned side wall to side wall, however, a 1/16 (1.5875 mm) minimum allowance is required between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closings of the control door and the lint door. D.
It is not necessary to have separate make-up air openings for each dryer. Common make-up air openings are acceptable. However, they must be set up in such a manner that the make-up air is distributed equally to ALL the dryers. EXAMPLE: For a bank of four (4) dryers, two (2) unrestricted openings measuring 2 feet by 2-1/2 feet (0.61 meters by 0.76 meters) - 10 square feet (0.93 square meters) - is acceptable.
ALL duct work should be smooth inside with no projections from sheet metal screws or other obstructions which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL duct work joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust duct work for periodic inspection and clean-out of lint from the duct work.
2. Single Dryer Venting Where possible, it is suggested to provide a separate exhaust duct for each dryer. The exhaust duct should be laid out in such a way that the duct work travels as directly as possible to the outdoors with as few turns as possible. It is suggested that the use of 90° turns in the ducting be avoided; use 30° and/or 45° angles instead. The shape of the exhaust duct work is not critical so long as the minimum cross section area is provided.
IMPORTANT: For extended duct work runs, the cross section area of the duct work can only be increased to an extent. When the duct work approaches the maximum limits noted in this manual, a professional heating venting air conditioning (HVAC) firm should be consulted for proper venting information. ALL duct work should be smooth inside with no projections from sheet metal screws or other obstructions which will collect lint.
IMPORTANT: For extended duct work runs, the cross section area of the duct work can only be increased to an extent. Maximum proportional duct work runs, cannot exceed 15 feet (4.57 meters) more than the original limitations of 15 feet (4.57 meters) with two (2) elbows. When the duct work approaches the maximum limits as noted in this manual, a professional HVAC firm should be consulted for proper venting information.
19
F. ELECTRICAL INFORMATION 1. Electrical Requirements It is your responsibility to have ALL electrical connections made by a properly licensed and competent electrician to assure that the electrical installation is adequate and conforms with local and state regulations or codes. In the absence of such codes, ALL electrical connections, material, and workmanship must conform to the applicable requirements of the National Electrical Code ANSI/NFPA NO.
2. Electrical Service Specifications M LG-82 (Gas) M LS-82 (Steam) ELECTRIC SERVICE SPECIFICATIONS (PER DRYER) IMPORTANT: 208 VAC and 240 VAC ARE NOT THE SAME. When ordering, specify exact voltage. NOTE: A. Fuse ratings are dual-element, time-delay, current limiting, class RK1 or RK5 ONLY. B. Circuit breakers are thermal magnetic (industrial) type ONLY. For others, calculate/verify correct breaker size according to appliance amp draw rating and type of breaker used.
3. Electrical Connections NOTE: A wire diagram is located in the front electrical control box for connection data. a. GAS MODELS and STEAM MODELS ONLY NOTE: A CIRCUIT SERVING EACH DRYER MUST BE PROVIDED. For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left hand corner of the dryer. To gain access to the service box and contactor, the service box cover must be removed.
G. GAS INFORMATION It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms with local and state regulations or codes. In the absence of such codes, ALL plumbing connections, material, and workmanship must conform to the applicable requirements of the National Fuel Gas Code ANSI Z223.1-LATEST EDITION, or in Canada, the Canadian Installation Codes CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.
2. Technical Gas Data a. Gas Specifications TYPE OF G AS Natural Manifold Pressure* Inline Pressure Liquid Propane 3.5 inches W.C. 8.7 mb 10.5 inches W.C. 26.1 mb 6.0 - 12.0 inches W.C. 14.92 - 29.9 mb 10.5 inches W.C. 26.1 mb Shaded areas are stated in metric equivalents * Measured at gas valve pressure tap when the gas valve is on. b. Gas Connections Inlet connection ---- 1-inch N.P.T. Inlet supply size ---- 1-inch N.P.T.
3. Piping and Connections ALL components and materials must conform to National Fuel Gas Code, or in Canada, the Canadian Gas Code specifications. It is important that gas pressure regulators meet applicable pressure requirements and that gas meters be rated for the total amount of ALL the appliance BTU's being supplied. The dryer is provided with a 1-inch N.P.T. inlet pipe connection extending out the back area of the burner box. The minimum pipe size connection (supply line) to the dryer is 1-inch N.P.T.
26
H. STEAM INFORMATION It is your responsibility to have ALL steam plumbing connections made by a qualified professional to assure that the installation is adequate and conforms with local and state regulations or codes. IMPORTANT: Failure to comply with the requirements stipulated in this manual can result in component failure which will VOID THE WARRANTY.
b. The steam supply piping to the dryer must include a 12-inch (30.48 cm) rise along with a drip trap and check valve. This will prevent any condensate from entering the steam coil. c. Flexible hoses or couplings must be used. The dryer vibrates slightly when it runs and this will cause the steam coil connections to crack if they are hard piped to the supply and return mains. d. Shut-off valves for each dryer should be installed in the supply, return, and drip trap return lines.
3. Steam Damper Air System Connections The MLS-82 is manufactured with a pneumatic (piston) damper system which requires an external supply of compressed air. The air connection is made to the steam damper solenoid valve which is located at the rear inner top area of the dryer just above the electric service relay box. a. Air Requirements Compressed Air Supply Air Pressure Normal 80 PSI 5.51 bars Minimum Supply 70 PSI 4.82 bars Maximum Supply 90 PSI 6.
5. Steam Damper Air Piston (Flow Control) Operation Adjustment Although the damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars), steam damper operation must be checked before the dryer is put into operation. Refer to page 32 and page 33 for instructions to check steam damper operation. If damper air adjustment is necessary, locate flow control valve and make necessary adjustments as noted below.
I. PREPARATION FOR OPERATION/START-UP The following items should be checked before attempting to operate the dryer: 1. Read ALL CAUTION, WARNING, and DIRECTION labels attached to the dryer. 2. Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label affixed to the back side of the top front control/service door. In the case of 208 VAC or 230/240 VAC, THE SUPPLY VOLTAGE MUST MATCH THE ELECTRIC SERVICE EXACTLY. 3.
J. PREOPERATIONAL TESTS ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions. 1. Turn on electric power to the dryer. a. Open ALL shut-off valves (Gas Models Only) 2. Refer to the Operating Instructions for starting your particular model dryer. 3. Gas Dryers a.
5. Make a complete operational check of ALL safety related circuits: a. Door Switch(es) b. Hi-Limit thermostats c. Sail switch (for Gas Models Only) NOTE: To check for proper sail switch operation (for Gas Models Only), open the main door and while holding main door switch plunger in, start dryer. Dryer should start but heat circuit should not be activated (on).
9. REVERSING MODELS ONLY - basket (tumbler) dryer should never be operated with less than a 30 lb. (13.7 kg) load (dry weight). The size of the load will affect the coast-down and dwell (stop) times. The basket (tumbler) must come to a complete stop before starting in opposite direction. a.
SECTION IV SERVICE/PARTS INFORMATION A. SERVICE 1. Service must be performed by a qualified trained technician, service agency, or gas supplier. If service is required, contact the distributor from whom the ADC equipment was purchased. If the distributor cannot be contacted or is unknown, contact the ADC Service Department for a distributor in your area.
SECTION V WARRANTY INFORMATION A. RETURNING WARRANTY CARD(S) 1. Before any dryer leaves the ADC factory test area, a warranty card is placed on the back side of the main door glass. These warranty cards are intended to serve the customer where we record the individual installation date and warranty information to better serve you should you file a warranty claim. a. If a warranty card did not come with your dryer, contact the ADC Warranty Department or ADC Service Department at (508) 678-9000. B.
2. Each part must be tagged with the following information: a. Model number and serial number of the dryer from which part was removed. b. Nature of failure (be specific). c. Date of dryer installation. d. Date of part failure. e. Specify whether the part(s) being returned is for a replacement, a credit, or a refund. NOTE: If a part is marked for a credit or a refund, the invoice number covering the purchase of the replacement part must be provided. NOTE: Warranty tags (ADC Part No.
SECTION VI ROUTINE MAINTENANCE A. CLEANING A program or schedule should be established for periodic inspection, cleaning, and removal of lint from various areas of the dryer, as well as throughout the duct work system. The frequency of cleaning can best be determined from experience at each location. Maximum operating efficiency is dependent upon proper air circulation. The accumulation of lint can restrict this airflow.
STEAM DRYERS Clean the steam coil fins. Suggest using compressed air and a vacuum cleaner with brush attachment. NOTE: When cleaning steam coil fins, be careful not to bend the fins. If the fins are bent, straighten by using a fin comb, which is available from any local air conditioning supply house. 90 DAYS 1. Remove lint from around basket (tumbler), drive motors, and surrounding areas. 2. Remove lint from gas valve burner area with a dusting brush or vacuum cleaner attachment. 3.
C. LUBRICATION 1. The motor bearings, idler bearings ... and under normal/most conditions the tumbler bearings are permanently lubricated. It is physically possible to relubricate the tumbler bearings if you choose to do so, even though this practice is not necessary. Use Shell Alvania #2 grease or its equivalent. The tumbler bearings used in the dryer does not have a grease fitting.
SECTION VII PROCEDURE FOR FUNCTIONAL CHECK OF REPLACEMENT COMPONENTS 1. Microprocessor (computer) Board a. Upon completing installation of the replacement microprocessor (computer) board, reestablish power to the dryer. b. Start the drying cycle by pressing any of the preset cycles in letters A-F. c. Verify that the motor(s) and the heat indicator dots, in the microprocessor (computer) L.E.D. (light emitting diode) display are on. (Refer to the illustration below.) 1.
d. Verify that the motor(s) heat, and door indicator lights on the back side of the microprocessor (computer) board are lit. (Refer to the illustration below.) 1) FAN (Blower) L.E.D. (light emitting diode) indicator 2) FOR (Forward) output L.E.D. indicator (for optional Reversing Models Only) 3) Rev (Reverse) output L.E.D. indicator (for optional Reversing Models Only) 4) HT 1 (Heat) output L.E.D. indicator 5) Fuse (Main Fuse) input L.E.D. indicator 6) Lint (Lint Door) input L.E.D.
e. Open main door. The dryer must stop and ALL output indicator lights on the back side of the microprocessor (computer) board must go out. (Refer to the illustration on previous page [page 42].) f. Try to restart the dryer with the main door open. g. The microprocessor (computer) boards L.E.D. (light emitting diode) display must read DOOR. h. Close the main door and restart the dryer. i. Functional check of microprocessor (computer) board is complete. 2.
3. For Direct Spark Ignition (DSI) System Models Manufactured With ADC Module Part No. 880815 a. Upon completing installation of the replacement Direct Spark Ignition (DSI) module, reestablish power to the dryer. b. Start the drying cycle. c. The ignition (DSI) modules L.E.D. (light emitting diode) indicator will be off for up to approximately 1.5-seconds (prepurge time). d. The modules indicator light will then turn green.
SECTION VIII DATA LABEL LOCATION/INFORMATION A. DATA LABEL Contact American Dryer Corporation When contacting American Dryer Corporation, certain information is required to insure proper service/parts information from American Dryer. This information is on the data label located on the inside of the control door. When contacting American Dryer please have the model number and serial number available.
THE DATA LABEL 1. MODEL NUMBER The model number is an ADC number which describes the size of the dryer and the type of heat (gas, electric, or steam). 2. SERIAL NUMBER The serial number allows ADC to gather information on your particular dryer. 3. MANUFACTURING CODE NUMBER The manufacturing code number is a number issued by ADC which describes ALL possible options on your particular model. 4.
SECTION IX BURNER and LINT (TUMBLER) CHAMBER MANUAL RESET HI-LIMIT INSTRUCTIONS I M P O R TA N T MANUAL RESET HI-LIMIT INSTRUCTIONS FOR PHASE 6 MODELS (GAS MODELS ONLY) This dryer was manufactured with a manual reset burner hi-limit and tumbler/lint chamber hi-limit thermostat which is monitored by the Phase 6 computer.
I M P O R TA N T MANUAL RESET HI-LIMIT INSTRUCTIONS FOR PHASE 6 MODELS (STEAM MODELS ONLY) This dryer was manufactured with a manual reset tumbler/lint chamber hi-limit thermostat which is monitored by the Phase 6 computer. If the manual reset thermostat is open prior to start of the drying cycle, the dryer will start momentarily and then shut down, displaying dRUM SAFETY FAIL with an audio indication.
ADC 113143 1 -05/01/00-25 2 -05/09/00-25 3 -05/26/00-50