Operating instructions

5
4
6 Pneumatic connection
The pneumatic system of the sewing unit and its optional equipment
have to be supplied with anhydrous compressed air.
The supply pressure has to be 8 to 10 bar.
Connecting the compressed-air maintenance unit
Connect the connection hose 3 (Order no. 0797 003031) to the
compressed a ir supply by using hose fixture R1/4".
Adjusting the operating pressure
The operating pressure is 6 bar.
It can be read off at the manometer 4.
Increase pressure:
Lift the turning handle 5 and turn it clockwise.
Reduce pressure:
Lift the turning handle 5 and turn it counter-clockwise.
10
2
4
6
8
10
3