user manual
22 Chapter 2
Making Measurements
Measurement Procedures
Measurement Procedures
Measurement is performed in 4 major steps below.
• Setting the port connections of the multi-port test set
• Setting the measurement conditions
• Calibrating the test set
• Performing measurement
Multiport test system needs to be properly installed before making measurements.
For the installation procedure see “Installation” on page 1-7.
Figure 2-1 Multiport Test System
Setting port connections of the multi-port test set
The procedure to set the test set port connections is described below. Note that the
port connections are set separately for each measurement channel.
Step 1. Press [Channel Next] or [Channel Prev] to select the channel for which you want
to execute multi-port measurement.