Installation & Assembly

2
Part 1of 2
Install Posts
Mark the post locations with a (X) in white paint and call
1.800.332.2344
After utilities have been located dig holes 36” deep.
Place posts in holes and check for level and correct distance
apart. Pull the string level firm from post to post points.
Adjust height of posts pounding down on the Posts or adding site
debris under the post to get the correct bottom of the gate height.
Mix concrete & fill holes taking care to not move the posts.
POSTS NEED 3-4 DAYS FOR CONCRETE TO SET.
Part 2of 2
Hanging the Gate
Bolt Hinges to hinge post
Hang Gate on “J “Hinge and adjust as required