AI 012174

FRAME ASSEMBLY INSTRUCTIONS
MODEL 012174-045-FR001
P204-0035-00
35*H7*T0.8mm
P204-0035-00
35*H7*T0.8mm
P204-0035-00
35*H7*T0.8mm
P204-0035-00
35*H7*T0.8mm
Second tier fixture
First tier fixture
Thread Rod
Steel wire
Second tier fixture wire
Metal lathe
Safety screw
First tier fixture wire
P4
WWW.ALLEGRICRYSTAL.COM
800.525.2655
INSTALLATION
NOTE: Large and heavy fixture, at list two set of hands needed
for assembly and installation.
A. firstly let the second tier S/S cable go through in the first lamp
body,and pull up in the top of first lamp body,then the second
lamp body wire binding in the metal link,let the wire of second tier
pull up in the top of fist lamp body by use metal link.
D. Lace all wires through chain every 3-4 links all the way up to ceiling
outlet box, pass wires through plate hickey and pull them out from the
middle hole.
NOTE:
(Safety wire/Aircraft cable must be attached independent from the
oultlet box)
E. Make wire connections as follows: Connect fixture ribbed wire to
power supply black wire, connect fixture smooth wire to power supply
white wire, connect fixture bare ground wire to outlet box green ground
wire. Use wire nuts and black electrician tape to secure all wire
connections or as especified by your local electric code.
B. Before screwing first tier fixture make sure to turn it several
times in a counterclockwise direction, this will help protect the
electric cord from getting squeezed.
C. Hung the light fixture to chain, release canopy by unscrewing
collar loop ring.
Second tier fixture wire
A
A
Metal link
(installed in the lamp body)
Metal link
the thin brass wire go through
the metal link and binding
in the metal link