Installation Guide

4
INSTALLATION INSTRUCTIONS
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not attempt
to assemble the product.
Estimated Installation Time: 45 minutes (24 hours for silicone caulk to dry).
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, silicone
caulk, power drill with drill bit, measuring tape, level.
1. With 2 people, place the vanity on its back on
a flat, scratch free surface. Locate the Center
Support Leg (L) and screw into the base of the
vanity. Once complete, lift the vanity back up
into the upright position.
WARNING
Vanity (A) MUST be secured to the wall.
Note: Clean area where the vanity (A) will
be permanently located prior to beginning
installation, ensuring the vanity (A) will not
interfere with any water supply and drain
lines once mounted.
2. With two people, carefully place vanity (A)
against the wall in its final location. Find and
mark locations of wall studs behind the
permanent location of vanity (A).
From inside vanity (A), drill hole through
vanity mounting area into wall studs.
Using mounting hardware (not included)
appropriate for your installation site, secure
vanity (A) to wall stud. If possible, secure
vanity (A) to two wall studs for increased
stability.
Note: Use preassembled levelers on feet of
vanity (A) to level the item. Twisting the levelers
counterclockwise will increase the height of vanity
(A), twisting them clockwise will decrease it.
2
A
1
A
L