Installation Guide

6
IS35691-I2
Hold the 1 in. mounting bracket (E)
against the wall so the mark from step 3 is
centered in the top screw hole. Mark the
location of the other screw hole, making
sure it is centered on the previously
drawn vertical line.
Repeat this step for the other end of the
tub, using the 7/8 in. mounting bracket (D).
NOTE
: The opening of the mounting
brackets face toward the outside of the
tub.
3.
E
3
4a.
For drywall installations, use a 9/32 in. drill bit
(not included) and drill a hole at each of the
marked locations. Insert drywall anchors (EE).
For stud installations, use a 5/64 in. drill
bit (not included) and drill a hole at each
of the marked locations.
NOTE: If installing into a material other
than drywall or into stud, consult a
professional for proper installation.
Hardware Used
x 4
Drywall Anchor
4
EE
EE
4b.