User's Manual

Overview
40
Rack-Mounting
the Provider Unit
To install the Provider unit in an AT-MCR12 rackmount chassis, perform
the following steps:
1. Configure the right VDSL CONFIG switch (SCBR/PROV) to the SCBR
position as shown in Figure 13 on page 39.
2. Attach the unit to one of the sliders that holds the unit in the chassis,
as shown in Figure 14.
Figure 14. Rack Mount - Set on Slider
3. Position the slider, as shown in Figure 15 and push into the chassis.
Figure 15. Rack Mount - Set in Rack
4. To connect the cables, see “Cabling the Provider Unit” on page 41.
V
D
S
L L
IN
E
10Base-T/
100B
ase-TX
LNK/A
CT
100M
PWR
LINK
R
A
TE
N
O
L
IM
I
T
F
A
S
T
S
C
B
R
6
d
B
R
AT
E
L
IM
I
T
IN
T
L
PRO
V
9
d
B
AT-M
C
606
VDSL
EXTENDED ETHERNET
V
D
S
L
C
O
N
F
I
G
P
R
O
V
SCB
R
1636
P
O
W
E
R
MCR12
1939
A
SYM
F
AST
SCB
R
6
dB
SYMINT
L
P
R
O
V9dB
V
D
S
L
C
O
N
F
IG
1
0
B
a
s
e
-
T
/
1
0
0
B
a
s
e-T
X
L
N
K
/
A
C
T
1
0
0
M
P
W
R
V
D
S
L
L
IN
E
L
I
N
K
R
A
T
E
P
R
O
V
S
C
B
R
A
T
-M
C60
6
V
D
S
L
E
X
T
E
N
D
E
D
E
T
HE
R
N
E
T