4.  System Pre-Installation
4.1  Site Selection
The power system must be mounted in a clean and dry environment.
Consider both the floor loading and the physical space required for the AMPS24 HP power system
and the batteries.
4.1.1  Floor Plan Layout
Sufficient free space must be provided at the front and rear of the power system to meet the cooling
requirements of the power system and to allow easy access to the power system components.
Consider the following before selecting a location for the AMPS24 HP power system
Structure of building able to support the additional weight
Enough space to meet requirements for access
Enough space to meet cooling requirements
Adequate space to do the install
Route that equipment will take through the building to reach the site
Check and record distances to load
Check and record distances to AC power source
Check and record distances to batteries/DC power source
Understand the full load on the DC system
Window for working hours and other similar restrictions
How much and what kind of prep work can be done in advance
x Reinforce floors
x Install distribution panels
x Install cable racks
x Run wiring
x Minimize cable lengths (cost)
x Minimize cable flow and congestion
4.2  Recommended Installation Layout
Minimum clearance front and back for installation and maintenance is 3ft (1m
Minimum clearance front and back for for air flow is 1 foot
Sides, top, bottom: no clearance required