User Manual

Page 5 of 7 EPH-N00-06077
6-3-02
4
Slide the strike jamb [F] over one of the mounted
wall jambs [B] with the magnet facing outward.
Measure the wall-to-wall opening at the top and at the
bottom of the wall jambs and note the smaller dimension.
Measure the width of the door panel [E] at the bottom rail.
Add 2 1/4" to the door width, subtract the total from the
minimum wall-to-wall opening and divide the result by
two. This should be the distance from the wall to the strike
jamb at the closest point. Plumb the strike jamb vertically
and mark its location on the wall jamb with a pencil.
5
6
Inside the shower enclosure, drill two 1/8" holes
thru the strike jamb [F] and into the wall jamb [B] 3/8" to
3/4" from the wall and approximately 1" vertically from
each end of the strike jamb. Drill a third hole centered
between the first two, then enlarge the three outer holes
with a 3/16" drill for clearance on the self-tapping screws.
Attach the strike jamb permanently with three #8 x 1/4"
truss head screws [G].
Slide the door panel [E] over the other wall jamb
[B] until the door panel and the strike jamb [F] can meet.
With the door closed and the latch magnets engaged, the
proper door panel to strike jamb clearance is 1/8" (see
illustration). Mark the hinge jamb’s location on the wall
jamb with a pencil.
Attach the hinge jamb and door panel permanently per the
instructions in Step #5.