K-V94Z - Ventura INSTRUCTION MANUAL Neo-angle shower doors KV009
READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING IT IS RECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION INSTALLATION OVER CERAMIC TILE If your shower door is to be installed over ceramic tile, tile should extend completely under both wall jambs. Silicone should be used to seal the line where ceramic tile meets the base. HOW TO CARE FOR YOUR DOOR Never use scouring powder pads or sharp instruments on metal work or glass panels.
Please keep this manual and product code number for future reference and replacement parts ordering if necessary.
PACKAGING CHECK LIST & HARDWARE 7 6 5 4 8 9 3 2 1 DOOR PANEL (1) 1 11 10 5 SIDE SUPPORT BAR (2) 9 FIXED PANEL (2) 2 6 135° CONNECTOR (2) 10 WALL JAMB (2) 3 7 WALL BRACKET (2) X 10 WALL PLUG X16 SCREW CAP 8 BOTTOM DOOR GASKET (1) CENTER SUPPORT BAR (1) 11 4 SET OF HANDLES (1) THRESHOLD (1) SHORT SUPPORT BAR (2) X 20 SCREW 3/16” LG X4 SCREW 1” LG X 10 SCREW 1 3/8” LG X8 SCREWHOLDER X1 KEY PAGE 1
INSTRUCTION MANUAL NOTICE CUT-OUT APPROPRIATE TEMPLATE ON THE BACK OF THE CARTON BOX BEFORE SHOWER INSTALLATION Step 1 CARTON BOX Step 2 TEMPLATE PAGE 2
INSTRUCTION MANUAL 3 4 HOLE = 1/4’’ NOTE USE TEMPLATE TO LOCATE WALL JAMB POSITION ON THE BASE Step 3 WALL JAMB (2) 4A 3A Step WALL PLUG (8) 4B 4 3B 4C PAGE 3
INSTRUC TION MANUAL Step 6 FIXED PANEL (2) 8 DOOR PANEL SHUTTING BAR (1) Step 7 SHORT SUPPORT BAR (2) + SCREW 5/16” LG (4) PAGE 4
INSTRUCTION MANUAL Step 9 FEMALE PIVOT SUPPORT (1) + SCREW 1” LG (2) 9B 9A Step 8 DOOR PANEL (2) PAGE 5
INSTRUC TION MANUAL Step 10 135° CONNECTOR (2) + CENTER & SIDE SUPPORT BAR (2) LEVEL Step 12 SET OF HANDLES (1) Step 11 SCREW 5/16” LG + CAP (16) PAGE 6
INSTRUCTION MANUAL 24 Hours Step 15 SILICON SEAL EXTERIOR Step 13 BOTTOM DOOR GASKET (1) INTERIOR SHOWER SIDE Step 14 THRESHOLD (1) + SILICONE UNDERNEATH TOP VIEW PAGE 7