W1Tub-60-66 INSTRUCTION MANUAL TUB DOOR 2 PEOPLE REQUIRED KW003 IT IS MANDATORY TO HAVE A WALL STUD ON EACH SIDE OF.
INSTRUCTION MANUAL GENERAL INSTRUCTIONS • Read this manual carefully and completely before proceeding. • It is recommended that you wear safety glasses at all times during the installation. INSTALLATION OVER CERAMIC TILES • If your tub door is to be installed over ceramic tiles, the tiles should lay completely under the wall jamb. • Silicone should be used to seal the gap where the ceramic tiles meet the panel. NOTICE • Caulking: no sealant is required inside the tub.
INSTRUCTION MANUAL TOOLS AND MATERIAL REQUIRED LONG NOSE LOCKING PLIER 1/4˝ & 1/8˝ DRILL BITS CUTTING PLIER MALLET SCREWDRIVERS SILICONE LEVEL RUBAN DOUBLE FACE VHB DRILL PENCIL TAPE MEASURE 5/16” HEX NUT DRIVER TO INSTALL THE TUB DOOR ON CERAMIC TILES, USE A 1/4’’ DRILL BIT FOR CERAMIC TILES.
INSTRUCTION MANUAL PARTS LISTING HARDWARE 13 14 5 15 12 11 20 16 13 21 1 6 22 19 2 23 9 3 24 7 18 10 4 4 17 8 25 26 ITEM PARTS 1 WALL JAMB QTY 1 2 EXPANDER 1 3 EXPANDER GASKET 1 4 FIXED PANEL U CHANNEL 1 5 MIDGASKET 1 6 DOOR SIDE GASKET 1 7 BOTTOM DOOR GASKET 1 8 ALUMINUM THRESHOLD 1 9 DOOR PANEL 1 10 FIXED PANEL 1 11 ROLLERS 2 12 RUNNING RAIL 1 13 WALL MOUNT BRACKET 2 14 GLASS FASTENER 2 15 STOPPER 1 16 ANTI-JUMP 2 17 BOTTOM GUIDE 1 1
INSTRUCTION MANUAL 1 1a VvVV DOOR PANEL ASSEMBLY Use a mallet to install bottom gasket (7) on the bottom of the door panel (9). To facilitate installation place door panel on cardboard packaging box and use as platform. Notice the holes are situated at the top of the panel. 1b Measure and cut 3/8” off the edge of the gasket. Be sure to cut opposing side of door handle holes. 1c Install both rollers (11) through the top holes of the door panel.
INSTRUCTION MANUAL 2 WALL JAMB INSTALATION 2a Place door panel (9) inside tub to simplify following installation procedures. Place the panel on cushioned surface, such as a towel or carboard, to prevent damage either to the panel or the tub. 2b Temporarily place bottom guide (17) on tub base. with The back of the bottom guide must be placed the inner edge of the shower base. 2c While keeping bottom guide in place at the edge of the shower base, trace a line in the center of the front channel.
INSTRUCTION MANUAL 2 WALL JAMB INSTALATION 2e Place wall jamb against wall using centerline previously marked as a guide. Be sure to center the slotted holes with the centerline. 2f Level and mark locations of the four holes to be drilled. 2g Remove the wall jamb. 2h Drill a hole in each location with a 1/4” drill bit. 2e 2f 1 2g 2h 1 CERAMIC TILE INSTALLATION USE A BIT FOR CERAMIC TILE.
INSTRUCTION MANUAL 2 2 WALL JAMB INSTALATION / INSATLLATION DES JAMBAGES / INSTALACIÓN DE PERFILES DE SUJECIÓN WALL JAMB INSTALATION 2i Insert one drop of silicone in each hole in the wall before inserting the supplied wall plugs (4x) 2j Add silicone to exterior bottom edge of wall jamb. 2k Fasten the wall jamb to the wall with 1-1/4” screws (22) through the previously installed wall plugs.
INSTRUCTION MANUAL 4 RUNNING RAIL 4a Unfasten set screws from wall bracket (13). (x4) Then remove back plate from the wall braket and set aside 4b With back plates of wall brakets removed, slide the wall brackets away from the ends of the running rail (12). 4a 4b 12 13 5 GLASS FASTENERS 5a Align running rail holes with holes in rail. panel. Level 5b Install glassfasteners (14) through the panel openings (x2). Be sure to place gaskets between all contact with glass and metal parts.
INSTRUCTION MANUAL 5 RUNNING RAIL 5d Push wall brakets against wall. (x2) 5e Trace outer side of wall braket.
INSTRUCTION MANUAL 6 BOTTOM GUIDE 6a Trace edge of U-channel (4) to determin location of bottom guide. 6b Remove glass fasteners, running rail along with wall brackets, panel and U-channel (4). Put aside. Only the wall jamb (1) and previously assembled door panel should stay in place. 6a 6b 1 4 7 WALL BRAKET BACK PLATE 7a Align back plate of wall braket to previously traced mark on wall. Trace hole centers to determine drilling location.
INSTRUCTION MANUAL 4 8 U CHANNEL EMPLACMENT 8a Apply double sided VHB tape to bottom of U-channel (4). 8b Align u-channel with previsouly marked line on base. Make sure that the u-channel is straight (use level or previsouly traced centerline if needed) then press down to secure to base. CLEAN BOTTOM OF U-CHANNEL AND BASE BEFORE APPLYING DOUBLE SIDED VHB TAPE TO UNDERSIDE OF U-CHANNEL.
INSTRUCTION MANUAL INSTALLATION DES PIÈCES DE FINITIONS / 9 4 FIX PANEL INSTALLATION 9a Align bottom guide to edge of U-Channel and center it with center of U-Channel. 9b Once in place mark hole location. 9c Drill with 1/8” drill bit in marked location, then apply a drop of silicone in hole. 9d Reposition bottom guide and secure in place with screw provided. Top with screw cap. 9e Install panel. Be sure to level panel and align edge with end of bottom guide.
INSTRUCTION MANUAL 10 RUNNING RAIL Install running rail. Align holes in rail with glass 10a fasteners (14) level rail. Tighten glass fasteners with 10a key to hold rail in place. (see step 5) INSIDE OF TUB 10b Push wall brackets towards wall and lock in with back plate previsouly secured to wall. Repeat on opposite side. 5c Tighten set screws to secure in place with provided 10c allen key.
INSTRUCTION MANUAL 11 5 WALL JAMB AND EXPANDER DOOR PANEL INSTALLATION / INSTALACIÓN DEL PANEL DE LA PUERTA 11a Drill through wall jamb hole with 1/8” drill bit, to perce through the expander. (x3) 11b Screw 3/4” screws (21) through holes to hold expander and wall jamb together in place. (x3) Cover all screws with screw caps (24). INSIDE OF TUB 4 1 12 2 2 DOOR PANEL INSTALLATION 12a Install door panel (9). Align and place roller (11) on runing rail (12).
INSTRUCTION MANUAL 6 13 DOOR GASKETS 13a 13a Temporarily install midgasket (5) and door side gasket (6) to door panel. 13b Close door entirely, mark interference of gaskets with running rail. 13c Cut gasket at marked locations with cutters. Note that midgasket (5) needs only to be cut below running rail. The top part is no longer required for assembly. 13d Reinstall gaskets on door starting from bottom and working your way up.
INSTRUCTION MANUAL 146 ANTI-JUMP & DOOR STOPPER Install Anti-Jump (16) in lower holes of door panel 14a located below the running rail. Be sure to place gas- kets between contact of glass and aluminium parts. (x2) 14a Install door stopper (15) located in the interior of 14b shower next to wall jamb. Use hole provided in INSIDE OF TUB running rail.
INSTRUCTION MANUAL 15 DOOR RECEIVER INTALLATION Place door receiver (18) against wall, place so 15a that the door panel slides smoothly into receiver. Mark hole location. 15a 15b Drill in marked location with 1/8” drill bit. Use ce 15b ramic drill bit if drilling through ceramic tiles. 15c 18 Insert one drop of silicone into hole. Screw in place with provided screw and cap with 15d screw cap. 15c 16 15d THRESHOLD Place threshold (8) between wall and bottom 16a. Cut off any excess length.
INSTRUCTION MANUAL 17 SEALING 17a Silicone the outside of the tub along the wall jamb and the exterior side of aluminum threshold and U-channel. 17b Wait 24 hours before using the shower to allow silicon to dry.