Specification

FINISHED FLOOR
APPLY SEALANT
• Move HANDLE (23) onto “off” position and remove STREAM
STRAIGHTENER (24) with KEY (25) supplied.
• Turn on water supplies and check all connections for leaks.
Check MANIFOLD (26) connections for leaks.
• Apply sealant to underside edge of ESCUTCHEON (27). Slide
ESCUTCHEON (27) down to nished oor. Press into place.
Clean up excess sealant.
• Operate HANDLE (23) On to Off and Hot to Cold to ush water
lines thoroughly.
• Lift HAND SHOWER (21) from the HOLDER (22) and direct spray into
tub. Rotate DIVERTER KNOB (28) and check HAND SHOWER (21)
and SPRAY HOSE (19) connections for leaks.
• Rotate DIVERTER KNOB (28) back and place HAND SHOWER (21)
into HOLDER (22).
• Re-install STREAM STRAIGHTENER (24).
TEST INSTALLED FAUCET
7 1
• Align slot in RETAINING RING (13) with SET SCREW HOLE (14) in SPOUT (15).
Install SPOUT (15) onto FAUCET BASE (16). Align SPOUT (15) with bath and
tighten SET SCREW (17). (VIEW “B”)
• Install SEALS (18) on both ends of the SPRAY HOSE (19). Connect the end with
the hex to the DIVERTER (20) using an adjustable wrench. Hand tighten the
connection to the HAND SHOWER (21).
Note: When not in use, the HAND SHOWER (21) should
be seated in the SHOWER HOLDER (22).
INSTALL SPOUT AND HAND SHOWER
9b
15
19
23
26
21
18
24
15
20
17
17
14
13
22
25
16
28
27
(VIEW “B”)
(VIEW “B”)
M965638 REV. 1.3 (10/15)