Installation Guide

Certified to comply with ANSI A112.18.1M U.S. PATENT NO. D269,696
Certificado para cumplir con ANSI A112.18.1M PATENTE U.S. Nº D269,696
Certifié conforme à la norme ANSI A 112.18. 1M Brevet É.-U. no D269,696
ROUGHING-IN DIMENSIONS
DIMENSIONES CALCULADAS
DIMENSIONS
PLOMBERIE BRUTE
THREE HANDLE BATH/SHOWER
CONJUNTO DE TINA/DUCHA DE TRES MANIJAS
ROBINETS DE BAIN/DOUCHE À 3 POIGNÉES
3375 SERIES
SERIE 3375
SÉRIE 3375
3-5/8" REF.
3-5/8" REF.
RÉF. 3-5/8"
6-1/2 REF.
6-1/2 REF.
RÉF. 6-1/2"
FINISHED WALL
PARED TERMINADA
MUR FINI
1-1/4 DIA HOLE
AGUJERO 1-1/4 DIAM.
TROU DIA. 1-1/4
TOP OF TUB RIM
PARTE SUPERIOR
DEL ANILLO DE TINA
HAUT - BORD DE
LA BAIGNOIRE
VALVE INLETS
1/2 C.W.T. OR
1/2 N.P.T.M.
ENTRADAS DE VÁLVULA
1/2 C.W.T. O
1/2 N.P.T.M.
SOUPAPES D’ENTRÉE
1/2 CWT OU 1/2 NPTM
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 78''
OPCIONAL PARA TERMINAR
PISO HABITUALMENTE
ENTRE 65'' Y 78''
OPTIONNEL : NIVEAU DÉFINITIF DU SOL,
HABITUELLEMENT ENTRE 165 ET
198 CM (65" - 78")
1/2 N.P.T. SHOWER ARM
1-1/4 DIA HOLE
AGUJERO 1-1/4 DIAM.
TROU DIA. 1-1/4
1/2 COPPER SPOUT NIPPLE
1/2 COPPER
PICO BOQUILLA DE UNIÓN
MAMELON 1/2 NPT
1/2 N.P.T. BRAZO DE DUCHA
BRAS DE DOUCHE 1/2 NPT
4-3/4 REF.
4-3/4 REF.
RÉF. 4-3/4
1" REF.
1" REF.
RÉF. 1"
1" MIN. 2" MAX.
1" MIN. 2" MAX.
2,54 CM MIN. 5,08 CM MAX.
(2) 1-3/4 DIA. HOLES
FOR VALVES ON 8" CENTERS
(2) AGUJEROS 1-3/4 DIAM.
PARA VÁLVULAS EN CENTROS DE 8"
(2) TROUS DIA. 1-3/4 POUR
ÉLÉMENT CENTRAL DE 20 CM
NOTE: NO CONCEALED PIPING FURNISHED
NOTA: CAÑERÍA ABIERTA ABASTECIDA
NOTA : NE COMPREND PAS LA TUYAUTERIE DISSIMULÉE
M968253 Rev.1.4
COLONY/COLONY SOFT
Gracias por seleccionar los productos American Standard, sinónimo de la mejor calidad
durante más de 100 años. Por favor lea estas instrucciones detenidamente antes de
comenzar para que lleve a cabo la instalación sin contratiempos.
Nous vous remercions d’avoir choisi American Standard… synonyme de qualité supérieure
depuis plus de 100 ans. Pour vous assurer que l’installation se déroulera sans difficulté,
veuillez lire attentivement ces instructions avant de commencer.
Thank you for selecting American-Standard...the benchmark of fine
quality for over 100 years. To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.
Installation Instructions
Instrucciones de Instalacion
Instructions d'installation
BOTTOM OF TUB
FONDO DE LA BAÑERA
FOND DE BAIGNOIRE
15/16"
15/16" (21.5 MM)
21.5 mm (15/16 po.)
4"
4" (102 MM)
102 mm (4 po.)
3375.502
3375.302
CARE INSTRUCTIONS:
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH
A SOFT COTTON FLANNEL CLOTH.
INSTRUCCIONES DE CUIDADO DEL PRODUCTO:
LIMPIE EL PRODUCTO CON AGUA LIMPIA Y SÉQUELO CON UNA TELA
SUAVE DE FRANELA DE ALGODÓN.
INSTRUCTIONS POUR L'ENTRETIEN
FAIRE : SIMPLEMENT RINCER LE PRODUIT AVEC DE L'EAU CLAIRE JUSQU
CE QU'IL SOIT PROPRE SÉCHER AVEC UN LINGE DE FLANELLE DE COTON DOUX.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH,
ABRASIVES, HARSH CLEANERS, OR A CLOTH WITH A COARSE SURFACE.
NO LIMPIE EL PRODUCTO CON JABÓN, ÁCIDOS, PULIDORES, ABRASIVOS,
LIMPIADORES FUERTES O TELAS ÁSPERAS.
NE PAS FAIRE : NE PAS NETTOYER LE PRODUIT AVEC DES SAVONS, DE
L'ACIDE, DU POLISH, DES ABRASIFS, DES NETTOYANTS AGRESSIFS OU UN
LINGE À TEXTURE RUGUEUSE.
ASSISTANCE TÉLÉPHONIQUENUMBERO DE EMERGENCIAHOTLINE FOR HELP
For toll-free information and answers to your questions, call:
Para información y respuestas a sus preguntas, llame sin costo al:
Pour information et réponses à vos questions, composer sans frais:
Product names listed herein are trademarks of American Standard Inc.
© AS America, Inc. 2008
1 800 442-1902
Weekdays Días laborales de las Sur semaine:
8:00 to 6:00 p.m. EST
CANADA 1-800-387-0369 (TORONTO 1-905-306-1093)
Weekdays Días laborales de las Sur semaine:
8:00 to 7:00 p.m. EST
COLD
FRÍA
FROID
HOT
CALIENTE
CHAUD
SHR
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
3
4
2
8
10
1
9
11
CROSS
BRACE
CRUZAR
PLANTILLA
ENTRETOISE
5
1
ROUGHING-IN FITTING
AJUSTE CALCULADO
IMPORTANT:
DO NOT REMOVE PLASTER GUARDS (2) UNTIL STEP 2.
Secure VALVE BODY (1) to cross brace of wall structure.
Prepare SHOWER RISER (4) and ELBOW (3). Connect to TOP outlet, marked
"SHR" of VALVE BODY (1).
Prepare TUB FILLER PIPE (8), ELBOW (10) and roughing-in NIPPLE (9). Connect to
BOTTOM outlet of VALVE BODY (1).
Add cross braces to wall structure and secure SHOWER RISER (4) and TUB FILER PIPE (8).
Cap (11) COPPER PIPE (9) and PLUG (5) ELBOW (3), with valves closed open supply lines
and check for leaks. Open both VALVES and check for leaks.
Close both valves and turn off water supplies. Finish wall construction.
CAUTION
Turn off hot and cold water supplies before beginning.
IMPORTANTE: NO REMUEVA LAS PROTECCIONES DE YESO (2) HASTA EL PASO 2.
Prepare la instalación para agua de acuerdo con las dimensiones calculadas.
Instale la VÁLVULA (1) a la altura y profundidad indicadas. Asegúrese de que la salida marcada como "SHR" esté hacia arriba.
Instale las tuberías de la fuente (6). Pueden ser soldados o roscados (Conexión (7) no incluida).
Importante: Quitar todas las válvulas antes de soldar las tuberías de suministro al cuerpo de la válvula.
Asegure que el CUERPO DE LA VÁLVULA (1) cruce la plantilla de la estructura de la pared.
Prepare la TUBERÍA DE SUBIDA (4) y el CODO (3). Conecte a la salida SUPERIOR, marcada como
"SHR" en el CUERPO DE LA VÁLVULA (1).
Prepare la TUBERÍA DE LLENADO DE LA TINA (8), el CODO (10) y la BOQUILLA DE UNIÓN (9) calculada. Conecte a la salida INFERIOR del
CUERPO DE LA VÁLVULA (1).
Agregue las abrazaderas cruzadas a la estructura de la pared y asegure la TUBERÍA DE SUBIDA (4) y la TUBERÍA DE LLENADO DE LA TINA (8),
Tapa (11) TUBO de COBRE (9) y TAPÓN (5) CODO (3), con las válvulas cerradas abra las líneas de abastecimiento y busque pérdidas.
Abra ambas VÁLVULAS y busque pérdidas.
Cierre ambas válvulas y cierre el abastecimiento de agua. Termine la construcción en la pared.
Cierre el abastecimiento de agua fría y caliente antes de comenzar.
Prepare water supplies per Roughing-in Dimensions.
Install VALVE (1) at indicated height and depth. Make sure the outlet marked "SHR" is pointing upward.
Install SUPPLY PIPES (6). They can be threaded or sweated. (Union (7) not included).
7
6
IMPORTANT: REMOVE ALL VALVES BEFORE SWEATING SUPPLY PIPING TO VALVE BODY.
1-1/4"
1-1/4" (32 MM)
32 mm (1-1/4 po.)

Summary of content (3 pages)