Installation Guide

- 2 -
1
2
ROUGHING-IN
INSTALL COLD WATER SUPPLY
• Install a 2x6 Cross Brace within the wall between the Wall Studs.
• Determine the supply height from the nished oor and drill a 7/8 inch dia. hole at that location.
Install the 1/2" NPT cold water supply. Secure supply pipe to the Cross Brace.
Important: The supply pipe must extend 1/2" from the face of the finished wall
• Finish installing the wall board and the nished wall.
M985014 (3/19)
CAUTION
Turn off hot and cold water
supplies before beginning.
2X6 CROSS BRACE
7/8"DIA. HOLE
WALL BOARD
FINISHED WALL
FINISHED WALL
OPTIONAL TO
FINISHED FLOOR
2X6 CROSS BRACE
DRILL 7/8"
DIA. HOLE
WALL STUDS
16"
FINISHED WALL
1/2"
1/2"
NPT
SUPPLY
WALL BOARD
FINISHED WALL
SUPPLY NIPPLE
PIPE BRACE