Installation Guide
REPLACEMENT INSTALLATION:
ep 5: Venting
Step 1: Measuring
• Measure the distance between the cooking surface and the bottom of the range hood. A distance of
24” to 30”.
Step 2: Preparing The Hood
• Remove the unit from packaging. Position the unit on a flat non-abrasive surface.
•
Remove the 2 filters to allow access to the inside of the unit. (See Fig #1)
g # 4
Step 3: Attaching Vent/Damper
•
Depending on the exterior venting option chosen (See page 7), pop out the steel panel on either the top or
rear of the range hood (See Fig #2)
•
Using the supplied screws, attach the rectangular vent/damper to the top or rear of the range hood. (See Fig #3)
g # 4
Installations (refer to Page 4 for parts):
NOTE: Use threaded drywall anchors only when
mounting the hood on sheet rock. Mounting the hood
on wall studs or lumbars is highly recommended.
Fig #3
12
Fig # 2
Step 4: Installing the Hood
•
Using measurements provided on Page 16, measure and drill
4 holes into bottom of cabinet. (See Fig #4)
• Depending on exterior venting chosen (See page 7), use
measurements provided on Page 16 and cut vent hold in cabinet.
• Align range hood to the holes in the bottom of the cabinet and
screw in using the supplied screws. (See Fig #4
)
Fig #4
Fig #
1