User`s manual

<9.GeneralSpecications>
9-26
IM 01C25B01-01E
Unit: mm (approx. inch)
54
(2.13)
6
(0.24)
ø78(3.07)
ø70
(2.76)
Integral indicator
(optional)
Ground terminal
Zero
adjustment
External indicator
Conduit connection
(optional)
Vent plug
Process connection
Process connector
(optional)
Conduit connection
● Universal Flange (Installation code -U)
Low
pressure
side
High
pressure
side
Electrical connection
for code 5, 9, A, and D.
Drain plug
Drain plug
Drain plug
Vent plug
54
(2.13)
110(4.33)
12
(0.47)
39
(1.54)
194(7.64)
143(5.63)
159(6.26)
95(3.74)
*1: When Option code K1, K2, K5, or K6 is selected, add 30 mm(1.18 inch) to the value.
46
(1.81)
125(4.92)
133(5.24)*
1
63
(2.48)
72
(2.83)
F0909.ai