User`s manual

<9.GeneralSpecications>
9-32
IM 01C25B01-01E
Unit: mm (approx. inch)
54
(2.13)
6
(0.24)
Electrical connection
for code 5, 9, A, and D.
Process connection
72(2.83)102(4.02)
234(9.21)
52
(2.05)
46
(1.81)
Electrical connection
for code 5, 9, A, and D.
54
(2.13)
6(0.24)
● Horizontal Impulse Piping Type (Installation code 9)
*1: When Installation code 2, 3, or 8 is selected, high and low pressure side on the above figure
are reversed. (i.e. High pressure side is on the right side.)
*2: When Option code K1, K2, K5, or K6 is selected, add 15 mm(0.59 inch) to the value in the figure.
● Vertical Impulse Piping Type
Integral indicator
(optional)
External indicator
Conduit connection
(optional)
Mounting bracket
(Flat-type,optional)
Process connection
Process connector
(optional)
Conduit connection
72(2.83)
94(3.70)
124(4.88)
159(6.26)
47
(1.85)
194(7.64)
125(4.92)
46
(1.81)
95(3.75)
Ground terminal
Zero
adjustment
Vent plug
2-inch pipe
(O.D. 60.5 mm)
Drain plug
143(5.63)
67
*2
(2.64)
54
(2.13)
ø78(3.07)
ø70
(2.76)
39
(1.54)
110(4.33)
12
(0.47)
Open to atmosphere
ø10(0.39)
Open to atmosphere
ø5(0.20)
Vent/Drain plugs
2-inch pipe
(O.D. 60.5 mm)
148(5.83)
*2
27
(1.06)
12
(0.47)
110(4.33)
ø78(3.07)
ø70
(2.76)
39
(1.54)
Process connection
Process connector
(optional)
Mounting bracket
(L-type,optional)
Conduit
connection
Integral indicator
(optional)
External indicator
Conduit connection
(optional)
72(2.83) 102(4.02)
234(9.21)
52
(2.05)
256(10.10)
143(5.63)
194(7.64)
97
(3.82)
95
(3.74)
46
(1.81)
Zero adjustment
Ground
terminal
High
pressure
side
*1
Low
pressure
side
*1
High
pressure
side
*1
Low
pressure
side
*1
F0916.ai
Process connector upside
(Installation code 6)
Process connector downside
(Installation code 7)