Installation & Assembly

RUN UNDERGROUND WIRE (INSIDE CONDUIT REQUIRED)TO POWER
SOURCE. ALWAYS RUN WIRE THROUGH CONDUIT IN AREAS SUCH AS
FLOWER BEDS, GARDENS, ETC., WHERE FUTURE DIGGING COULD CUT
WIRE CAUSING A FATAL ELECTRICAL SHOCK. NOTE: CONSULT YOUR
LOCAL ELECTRICAL CODE FOR WHAT IS THE REQUIRED WIRING TYPE
WHEN PREPARING THE FOUNDATION YOU NEED TO DIG A HOLE
ABOUT 12” WIDE BY 15” DEEP. AVOID LOCATING THE POLE TOO
CLOSE TO HOUSE TO HELP SPREAD LIGHT MORE EVENLY.DO
NOT LOCATE POLES WITHIN 10’ FROM THE INSIDE WALL OF A
SWIMMING POOL.
AFTER YOU FINISH POURING THE CEMENT YOU CAN BEGIN SETTING
YOUR ANCHOR BOLTS. INSERT BOLTS INTO TEMPLATE LEAVING
ENOUGH THREAD TO SECURE BASE WITH CAP NUTS.MAKE SURE TEM-
PLATE IS LEVEL WITH THE SURFACE.CONSULT THE DIRECTIONS ON THE
CEMENT BAG FOR THE AMOUNT OF TIME NEEDED FOR IT HARDEN.
ONCE YOUR WIRING IS COMPLETE, YOU ARE READY TO POUR
THE CONCRETE.NORMALLY IT TAKES ABOUT A 50 LB. BAG OF
READY-MIX. CHECK WITH YOUR LOCAL HARDWARE TO DETER-
MINE WHAT IS THE BEST CEMENT FOR YOUR GROUND.
PAGE 1
POLE LAMP FOUNDATION INSTRUCTIONS

Summary of content (2 pages)