Installation guide

MAINTENANCE / SERVICESECTION 6
KEEP APPLIANCE AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS,
PETROL AND OTHER FLAMMABLE VAPOURS AND LIQUIDS.
Water heater maintenance includes periodic tank flushing and cleaning, and removal of lime
scale. The unit should be inspected and adjusted to maintain proper combustion. Refer to
Fig 17 below, “Suggested Maintenance Schedule”. A periodic inspection of the flue
installation system should be made.
GENERAL
Following are the instructions for performing some of the recommended maintenance.
Unit inspection and adjustment should be performed by a competent qualified engineer.
As Correx Up
TM
anodes are fitted as standard to this appliance, no maintenance is
necessary.
MAINTENANCE
SCHEDULE
COMPONENT OPERATION INTERVAL REQUIRED
Tank Sediment Removal Every 6 months Flushing
Relief Valve Check Operation Every 6 months Proper
Operation
Exhaust & Air Inspect Every 3 Months Joints should
Intake System be sealed
Ignition System Inspect Annually Clean of dust
and dirt
Flue Vent Terminal Clean Inlet Screen As Required Soft Brush
Flue Terminal Free of Shrubs & Debris Monthly Remove object
Horizontal or that caused
Vertical restriction
Combustion System Inspect Monthly Confirm S-OP
Condensate Inspect Monthly Remove
Waste Pipe restriction
CORREX
ANODES
44
Fig.17