Installation Guide

15
Stage
1
st
Stage
2
nd
Stage
3
rd
Stage
4
th
S
tag
e
4
t
h
Stage
6
th
DRAIN
LINE
1
st
Stage - Sediment pre- r
2
nd
Stage - Carbon block pre- r
3
rd
Stage - Carbon block pre- r
4
th
Stage - Membrane
5
th
Stage - UV light
6
th
Stage - Inline carbon r
WASTE WATER
INPUT WATER
DRINKING
WATER
TO ICEMAKER OPTION
W
G
H
A
Z
Y
DRINKING WATER FAUCET
SINK
Option 1 Diagram
Stage
5
th
Fig. 11A
Details on Tubing Connections:
To ensure a smooth and correct installation, please connect the water lines following the sequence and
order outlined below. Refer to Fig.11 & 11A for proper point locations.
1. Point Z - Faucet connection:
Tubing color: Clear tubing. Connect the CLEAR tubing to the base of the RO faucet.
Fitting type: Quick Connect Fitting: Simply push Clear Tubing into Quick Connect Fitting. No Insert,
Sleeve or Nut needed here. (Attach threaded and of faucet adapter to the faucet metal
stem. No teflon tape needed here). See Fig.9A (Page 11)
2. Point X - Feed water connection:
Important: Insert and sleeve Must be installed to prevent water leaking. Metal compression nut must be
fully tightened! (See Page 8)
Tubing color: Red tubing. Connect the RED tubing to the Feed Water Needle Valve.
Fitting type: See Fig. 5C (Page 8). Metal compression nut fitting. Use plastic sleeve.
Add “insert to tubing. No teflon tape here. Tighten nut with wrench.