Installation Guide

18
Yellow Tubing
to Tank
Clear Tubing
to Faucet
Red Tubing
to Wa
ter Source
G
F
J
Y
e
ll
ow Tu
b
in
g
t
o Tank
C
l
ear Tu
b
in
g
t
o
F
au
cet
Red
Tu
T
bin
g
to Wat
er
e
Sour
c
G
F
J
3. Wait for tank to fill: Before usage, allow the tank to fill. Tank normally takes 2-3 hours to fill.
When the tank is filled, the RO will shut off automatically.
4. Drain Tank: Please do not use the first tank of water. Once the tank has filled, open
the drinking water faucet to drain the tank and filters. It will usually take
about 5 minutes to flush the unit. When the tank is completely empty water will
simply trickle out the faucet. At this time, please close the drinking faucet and allow
the unit another 2-3 hours to refill the tank. The 2nd tank of water will be ready for
use.
Please Note: Water may come out dark for the first few seconds on the initial
flush, and then clear right up. This is due to the GAC (granular activated carbon)
post filter.
5. Clean up area: Allow the system to run while cleaning up tools and work area.
6. Check for leaks! Make sure no leaking at joints, fittings, valves, and tubing connections.
Congratulations! You have successfully installed the Reverse Osmosis System!
* * * End Installation Section * * *
Step 7: System Start-Up
1. Turn on feed water: Slowly, turn on your Cold water supply. Open the Needle Valve (turn counter-
clockwise) to allow the raw water to enter the system. Check for leaks!
2. Open tank valve: Open the tank’s ball valve to allow water to enter the tank. The tank’s valve is
“On” when the valve handle is parallel (in the same direction) with the valve’s outlet (see Fig. 12).
Check for leaks!
3. UV Light: Please attach the UV Transformer to the UV light, then to power outlet. The UV light
indicator will illuminate once the UV unit is powered.