Installation Guide

4
INSTALLATION INSTRUCTIONS
4. Secure Bowl to Floor
Insert the bevel discs (HH) and bowl wing nuts (EE) onto the
T-bolts (AA). Tighten the bowl wing nuts (EE) to secure the
position of the bevel discs (HH). Place the bolt caps (GG) over
the T-bolts (AA) and snap into place.
CAUTION: Do not overtighten bowl wing nuts
because vitreous china can easily crack or chip.
Pour water into bowl to prevent the escape of sewer gases.
5. Install Tank-to-Bowl Seal
Turn the tank (B) upside down and press the tank-to-bowl seal
(II) into place over the lower tank opening.
6.
Unscrew the metal at washers (JJ) and wing nuts (MM) from
the tank screws (CC). Lower the tank (B) onto the bowl (A) and
let the tank screws (CC) protrude through the mounting holes
on bowl (A). From the underside of bowl (A), thread metal at
washers (JJ) and wing nuts (MM) onto the protruding tank
screws (CC). Tighten the wing nuts (MM) alternatively until the
tank (B) is evenly seated on the bowl (A).
7. Attach Water Supply Line
Connect the water supply line (not included) to the tank (B) and
shut-o valve. Tighten the tank connection coupling nut 1/4 turn
beyond hand tight.
CAUTION: Do not overtighten the tank connection
nut.
Turn on supply valve and allow tank to ll. Check for leaks at all
connections and tighten or correct as needed.
6. Install Tank on the Bowl
B