Specifications

ASBS
42
Fig. 3-33
Fig. 3-32
(4) When the check of drainage is complete, open the
check pin (CHK) and remount the insulator.
Cleaning the sub drain pan
Before beginning work, make necessary preparations
(e.g., prepare a bucket, wiping cloth, etc.).
(1) Unscrew the 2 screws securing the cover, and
place them on the reverse side to remove the
cover.
(2) Release the screw securing the sub drain pan
support L-shape bracket, and remove the bracket
while holding the sub drain pan with your hand.
(3) Drain any water and clean the sub drain pan by
tilting it downward. To remove the drain pump,
remove the 4 drain pump installation screws, the
drain hose, and the wiring.
Removing the side panel
(1) Push the tab on both sides of the side panel
inward (a) to disengage the tab (first stage) and
move the panel horizontally (b).
(2) Push the area in the vicinity of the tab (second
stage) inward while holding both sides of the side
panel to remove the side panel.
Drain pump installation screw
Drain pump
Drain hose
Sub drain pan
a
b
Tab (first stage)
Tab of both sides
Side panel
Tab (second stage)
CAUTION
Use 4 × 8 tapping screws to
fasten cover drainage. If the
screws used are longer
than 8 mm, it may make a
hole in the drain pan and
cause leakage.
CAUTION
Continuing to work without
holding the sub drain pan
causes accumulated water
in the sub drain pan to leak
out.
04-396 Inverter-W_a-p50 ARGO 12/21/04 9:38 AM Page 42