INSTALL HANGERS AND FASTENERS
Hangers need to be installed above the main
beams typically every four feet.
Snap a chalk line for each of the main
beams. Attach hangers and wires to the
deck above the rst row of main beams
at four-foot intervals.
Stretch a guide string from one end of
the room to the other, below the molding
where the rst main beam will hang.
Stretch a leveling string from one side
to the other 7/8" above the bottom of the
wall molding.
Bend the wires at the height of the string
so that the main beam is held at the
correct height.
Wrap hanger wire securely around itself three
times.
INSTALL THE FIRST MAIN BEAM
Install the rst section of main beam.
(Cut the end so that a cross tee route hole
is located the border distance in from the
end wall.)
Insert a hanger wire into a hanger wire
hole near the other end of the main beam.
Bend the wire up and wrap it around itself
three times. Continue to insert all other
hanger wires.
adjusted for the 10 unit grid
Bend hanger wires at height
of guide string
Install rst main beam