Instructions / Assembly

30
30H
Roof Install Prep Page
At this time, take a moment to ensure
the building is level and square.
Measure the building diagonally again to make sure the building is
square. The building should be square at the base and at the top.
This will make roof panels fi t better and holes will better align.
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
Read thru all of Roof Assembly before beginning Step 10.
The building is square when diagonal measurements are equal.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
85798578
4 3
FRONT
8578
7743
7743
7743
8579
7743
7743
7743
10
8
6
2
9
7
5
1
Roof Panel Placement Order
DO NOT FASTEN AT THIS TIME
FASTEN TO NEXT PANEL WITH BOLT AND NUT
FASTEN TO RIDGE CAP
FASTEN TO ROOF BEAMS WITH SCREWS
IMPORTANT: