Instructions / Assembly

33
Seal Ridge
Step 11: Roof Assembly
33H
Roof Panel
6
7743
Attach Panels #5 - #10 according to the diagram on page 30.
Weather stripping tape should be applied in
a continuous strip along the length of the roof.
You will need for this page:
(QTY: 8)
(QTY: 48)
Begin weather stripping the roof ridge. Apply more
of the weather stripping after each additional
Panel is installed. A strip of weather stripping tape
2” (5,1 cm) long should be applied over each bolt that is on
a rib overlap and under the Ridge Cap.
1
3
Secure rib #5 with two Small Bolts and Nuts as
shown to the right, and then cover with two 2” (5,1
cm) strips of weather stripping tape.
2
Attach the rst four Panels (#5 - #8) in the order
given in the diagram on page 30. Use the Roof Panel
Diagram on page 30 while assembling the roof.
Starting with rib #5 below, every rib that is over
a Truss should be secured with a Small Bolt and
Nut, and then sealed with a strip of tape.
1
2
3
4
5
Install Panels #9 - #10 and seal with weather
stripping tape.
4
Leave holes on ribs #1 and #2 open.
SBSS