Owner's manual

Hip & Ridge Detail
Headwall Detail
Shed Ridge Detail
Hip and ridge applications are handled in the same
manner.
1. Install ATA Guard underlayment over
the hip/ridge line.
2. After panels arre installed, cut “Z” closure to fit in
between battens and install in butyl tape
using 4 fasteners.
3. Seal neoprene strips behind “Z” closures (notched
neoprene for ridge; straight neoprene for hip).
4. Snap hip/ridge cap over “Z” closures for it to lock into
place. Pop-rivet one side only to allow for
expansion and contraction.
Notes:
* Trim must be pop-riveted to Z in at least (1) location.
* Unless otherwise specified, all fasteners for trim
components at 2’-0” o.c.
1. Install ATA Guard up to the edge of roof plane.
Install metal panel to the edge of substrate.
2. Place “Z” closure in butyl tape at top of panel. Fasten
Zee through butyl tape and panel into substrate using
4 fasteners. Seal neoprene closure into place
behind “Z” closure.
3. Install headwall transition over “Z” closure.
Fasten to wall with appropriate anchor fasteners.
4. Apply counterflashing over the headwall trim,
as required.
1. Place ATA Guard up to edge of roof plane.
Install metal panel up to the roof peak.
2. Fasten “Z” closure in butyl tape at top of panel.
Fasten Zee through butyl tape and panel into
substrate using 4 fasteners. Seal neoprene closure
into place behind “Z” closure.
3. Fasten starter cleat to face of trim boards at
2” below ridge line.
4. Install shed ridge cap trim over “Z” closure.
Pop rivet to zee closure at one per length.
Butyl Tape
#12 x 1”
Wafer Head
Screw
ATA-Guard
Eco-Seam Panel
ECO910 Zee Closure
Neoprene Closure
ECO315/ ECO300
Hip/Ridge Cap
12” Max.
Sealant
Appropriate Anchor Fasteners
Butyl Tape
#12 x 1” Wafer
Head Screw
ATA-Guard
Eco-Seam Panel
ECO910 Zee Closure
Appropriate Sealant
Neoprene Closure
ECO500 Headwall Trim
ECO980 Counterflashing
Butyl Tape
#12 x 1” Wafer
Head Screw
ATA-Guard
Eco-Seam Panel
ECO910 Zee Closure
Appropriate Sealant
Neoprene
Closure
ECO348 Shed
Ridge Cleat
ECO342 Shed
Ridge Trim