User manual

User Manual Page 42 of 74
(PVI-6000-OUTD-UK-W Rev.1.0)
5.5 Display LCD
5.5.1 Connection of system to the grid
The two-line Liquid Crystal Display is located on the front panel and shows:
9 Inverter operating status and statistics;
9 Service messages for operator;
9 Error messages and fault indications.
During regular operation, the display will cycle through available data. The display
changes to a different screen every 5 seconds or screens may be scrolled manually by
pressing the UP and DOWN buttons located to the right of the display.
1) These two screens are displayed upon inverter start-up:
2) The following screens may appear while waiting for the connection to be
established:
- While the system checks for grid connection to be established (“Missing Grid”), the
yellow LED next to the display turns on continuously, while the green LED is
flashing.
- When waiting for the input voltage to exceed 50Vdc (“Waiting Wind”), the green
LED turns on steady.
- When the “Missing Grid” and “Waiting Wind” conditions are verified, the inverter is
connected.
3) Time (seconds) to complete output voltage and frequency check.
It takes from 30 seconds to several minutes to complete the operation.
POWER-ONE
Initialing…
Please waitin
g
Missing Grid Waiting Wind
Next connections:
2 secs