Instruction manual

Installation
Select the best location
Install the mobile air conditioner in a
flat and spacious location where the air
outlets will not be covered up. A
minimum clearance of 50cm from walls
or other obstacles should be kept. The
appliance should not be used in the laundry.
The plug should be accessible after the appliance
is positioned.
Duct mount instruction
Temporary
1) Attach one end of the duct to the
exhaust air outlet of the mobile
air conditioner. According to the
arrow direction, push it downwards,
be sure to fix thoroughly.
2) Attach the other end of the duct
to adaptor B.
Mo
re
than 50cm
M
o
re t
han 50
cm
A
d
a
pt
o
r
B
Guide of customer
The customer should have a qualified power supply coincident with that
printed on the tag of the air conditioner. Its voltage should be in the range
of 90%-110% of its rated voltage.
The customer must use a special circuit and efficient grounding socket to
match the plug of the air conditioner.
If the supply wire is damaged, it must be repaired by a qualified electrician.
Keep the unit upright in order to protect the compressor.
The appliance should be installed in accordance with national wiring regulations.
The plug should be easily accessible after installation.
The adaptor A/B of duct must be well fixed after installation, so that it doesn't
point to people, animals, or flammable furniture etc.
For wiring diagram, please see the attached one which firmly on the appliance.
9