User manual

USER MANUAL 1.4 | EC1000
Berghof Automation GmbH | Harretstrasse 1 | 72800 Eningen | www.berghof.com
2VF100179FE04.docx | EC1000_HB_en_2D1652005ZD00.docx
17
2
1
2.6. Mounting and connecting
2.6.1. Mounting
The CANtrol E-I/O modules are intended for mounting rail installation (DIN EN 50022, 35 x 7.5 mm).
Push up the module against the mounting rail from below,
allowing the metal spring to snap in between mounting
rail and mounting area as illustrated.
Push the module above against the mounting wall until it
snaps in.
Rail mounting of module
CAUTION
There must be at least 100 mm clearance above and below the EC1000.
This guarantees the necessary convection cooling for the EC1000.
The mounting plate must be metal in order to ensure heat conduction.
To interconnect two modules
After snapping on the first module to the rail, snap on the second module about 1cm away towards the right
of the first module. Push the second module along the rail towards the first module until you hear the locking
device snap in.
To disconnect two modules
Push down the unlock button (see figure below) of the module that you wish to disconnect from the module
to the left of it. Push both modules away from one another until they are about 1 cm apart.
To snap on a
single module
To take down a
single module
Push the module up and against the metal spring lo-
cated on the underside of the rail guide.
Tip the module away from the rail as shown in the il-
lustration.
Pull the module down and out of the mounting rail.
Uninstalling a module
Unlock botton
1
2
3