User manual

USER MANUAL 1.4 | EC1000
Berghof Automation GmbH | Harretstrasse 1 | 72800 Eningen | www.berghof.com
2VF100180FE02.docx | EC1000_HB_en_2D1652005ZD00.docx
25
3. Controller operation
CAUTION
Never plug in, apply, disconnect or touch connections while the device is
operating!
This could result in malfunction or destruction of the device. Before working on
the modules, always switch all infeeds to them off; including infeeds from con-
nected peripheral devices such as remote-feed encoders, programming de-
vices, etc.
MALFUNCTION
3.1. Commissioning
Before applying the supply voltage, recheck all connections to ensure they are properly wired and have the
correct polarity.
Switching on
The module is not equipped with its own main power switch. The PLC controller starts when the associated
equipment is switched on or when the power supply is connected.
Switching off
The PLC controller switches off when the associated equipment is switched off or the power supply is discon-
nected.
3.2. Function Selection, Indicators, Diagnostics
3.2.1. Status Indicators
The function of the status indicators frequently de-
pends on the software development environment
employed on the PLC controller.
CP1131-P:
PLC programming using CODESYS and
Berghof Target Support Package.
CPC++:
C programming directly on the LINUX operating
system.
from 2VF100515DG01.vsd