- Backyard Products Outdoor Storage Shed Installation Instructions

17
YOU MAY NEED TO RACK YOUR WALL PANELS
AND ROOF PANELS TO ENSURE SQUARENESS
BEFORE COMPLETELY NAILING
IMPORTANT!!!
Building Tip
ES PRECISO ALINEAR LOS PANELES DE LOS
MUROS Y DEL TECHO ANTES DE CLAVARLOS
COMPLETAMENTE PARA ASEGURAR LA ESCUADRA.
1
2
3
4
Nail
Clavo
1/8" (3.2 cm)
IMPORTANTE!!!
Consejo
When building walls, always apply panel to front of building first.
Position panel flush with top of wall frame and nail in upper corners as
shown. Rack wall square by moving lower end of wall panel right or left
until panel is flush with framing along left edge and secure with one nail
in each lower corner. Continue nailing as instructed.
Racking a Wall
Alineando un Muro
Al construir los muros, aplique siempre el panel al frente del edificio.
Posicione el panel nivelado con la parte superior de la estructura del
muro y clávelo en la esquina superior como en el dibujo. Alinee
nivelado el muro por mover el lado inferior a la derecha o a la izquierda
hasta que el panel esté nivelado con la estructura a lo largo del borde
izquierda. Fije con un clavo en cada esquina inferior.
Nail corners 1 and 2, rack panel if necessary, nail 3 and 4
clavo esquinas 1 y 2, Alineando panel si hace falta, clavo 3 y 4
Set panel back 1/8” (3.2 cm) from face of trim
lugar la panel espalda 1/8" (3.2 cm) del la cara del moldura
Rack for Squareness
Nivele para escuadrar