User's Manual

Photo 7
Regulator
Run wires
to right
side of
bike
Battery
Zip Ties
Wires Exit Here
11. Voltage Regulator Installation: Install the voltage regulator as shown in the Photo
7. Use the 6 x 40 mm flange bolts and 3/4” long spacers to attach it where the original
AC regulator sat. Mount the regulator so that the wires exit the regulator towards the rear
of the motorcycle. Run the large bundle of wires from the regulator down underneath the
right side seat frame rail toward the front right corner of the airbox to be plugged in at a
later step.
12. Battery Mounting: The battery mounts to the airbox lid with double sided foam
tape and two 11 inch zip ties just in front of the airbox opening and behind the CDI unit
as shown in Photo 7. Position the battery so that the wires exit at the top right as shown.
Use the double sided tape to adhere the battery to the airbox lid. Drill two 3/16” holes in
the airbox lid just in front of the battery to allow you to further secure it with the two 11”
zip ties enclosed.
13. Front Turn Signals: The turn signals now come pre-attached to the Baja Designs
dual-sport kit headlight.
7