User Manual

10 96768 v.8.0
17. Remove all rags from the
intercooler up-pipe opening and
reconnect the rubber hose from the
intercooler up-pipe to the High-Ram
and tighten the clamp to 100 lb-in (11
N-m).
18. Rotate dipstick bracket and align
the dipstick bracket hole to the hole
on the High-Ram. Mount it to the High-
Ram casting using the original factory
bolt. See Figures 5 and 6.
NOTE: For 2004-2007 model vehicles,
locate the supplied corrugated loom
in your kit and install over the main
connector wires to protect it from
rubbing against the dipstick. See
Figure 7.
19. Reconnect the batteries. The
Banks High Ram installation is now
complete.
Figure 7