User guide

14 97273 v.2.0
Figure 5 Banks iQ System
WARNING: THE CHARGING CABLE
CONNECTED TO THE BANKS iQ IS
DESIGNED TO SUPPLY A CONSTANT
LOW-VOLTAGE POWER SOURCE
(+5VDC) TO THE BANKS iQ AND IS
“LIVE” AS LONG AS THE SYSTEM’S
OBD II INTERFACE CABLE OR BANKS
WIRING HARNESS IS COMPLETELY
INSTALLED AND THE USB CABLE
CONNECTOR IS PLUGGED INTO
BANKS iQ. ALTHOUGH THIS
CHARGING CABLE CIRCUITRY IS
FUSE-PROTECTED, THE USER IS
EXPECTED TO TAKE APPROPRIATE
MEASURES TO PREVENT SMALL
CHILDREN AND/OR PETS FROM
CONTACT WITH ANY PART OF THIS
SYSTEM.
9. Secure Banks iQ Bridge Module
under the dash to any dash frame
support using the supplied cable ties.
Use the cable tie support loops on the
side of the Bridge Module to securely
fasten it under the dash.
10. Route all wiring away from any
pedals or other moving components.
Using the cable ties supplied, secure
the wiring under the dash.
11. With the bridge module
connected, turn the key to the ‘ON’
position and wait for 30 seconds.
CAUTION: The USB interface cable
that connects the iQ to the Bridge
should be handled with care. Be
careful not to strain/pull the cable
while connected to the iQ.
12. Plug the USB interface cable
into the iQ. The iQ will wake up and
the initial boot screen will display for
approximately 10 seconds, followed by
on screen instructions for completing
the initialization process.
NOTE: The connection process should
be complete within about 10 second.
-END, SECTION 3-