Installation & Assembly

BARN DOOR HARDWARE KIT
INSTALLATION GUIDE
Step 3. Door Preparation – Strap Installation
Install the rollers on the reserved hole of the top of
door by 3/16''x15/32'' screw.
Step 4. CONCRETE Wall Preparation1
If installing with an opening for 80" standard door size,
remove the top trim and cut the side trim horizontally along
the height of the opening.
Door Height + 1 11/16"(43mm)
Position the rail by measuring up from the door height (H)
+ 1 11/16" to the centre of the track. Also ensure a gap of
3/8" - 1/2" at the bottom. Ensure the rail is level and leave
a minimum of 2" from the end of the rail to the side of the
opening.
3/8"(10mm)-
1/2"(12.7mm)
Gap under
the door
1830mm
(406mm)
16"
(406mm)
16"
(406mm)
16"
(406mm)
16"
x5
3/8"
(10mm)
1 3/16"
(50mm)
Position the rail in place ensuring that it is level, mark the
holes on the rail using a pencil and pre-drill 3/8" holes
into the concrete.
Step 5. CONCRETE Wall Preparation2
TSQ13BK-6FT+TKM04