Technical data

Safety
120-393 632.4 04.08 Fh
PARAMOUNT two 30 - 115 kW 7
IM/II - Flues for commercial and Industrial Gas Fired Boilers and Air
Heaters.
IGE/UP/1 - Soundness Testing and Purging Procedure for Non Do-
mestic Installations.
IGE/UP/2 - Gas Installation Pipe work, Boosters and Compressors
for Industrial Commercial Premises.
Manufacturer's notes must not be taken in any way as over-riding
statutory obligations.
2.5 C.E. Approvals
The CE approval symbol means that the boilerfulfils the basic re-
quirements of the Gas Equipment Directive 90/396/EEC, the Low
Voltage Directive 73/23/EEC as well as Directive 89/336/EEC
(Electromagnetic Compatibility EMC) of the Council for Unification
of Legal Regulations of the members Countries. The boiler fulfils
the basic requirements of the Boiler Efficiency Directive 92/43/
EEC for condensing boilers.