Technical data

Commissioning report
76 POTTERTON COMMERCIAL
120-393 632.4 04.08 Fh
11. Commissioning report
REPORT SENT TO
INSTALLER:
YES NO
SITE VISIT COMMISSIONING
Date:.......................................................................
Signature: ..............................................................
REPORT No: ..........................................................
SITE ADDRESS: ...................................................
................................................................................
................................................................................
................................................................................
................................................................................
INSTALLER NAME & ADDRESS:..........................
...............................................................................
...............................................................................
...............................................................................
...............................................................................
VISIT/COMMISSIONING DATE: ...........................
1.0 BOILER
1.1 Type:
1.2 No of Sections:
1.3
Boiler
No/Position:
RH LH Centre
1.4 Serial No:
1.5 Fuel: N/Gas LPG
2.0 BURNER
2.1 Type: Standard Low NOx Ultimate
2.2
Flame
Detection
Probe:
UV Cell Thermocouple
2.3* Control Box Type:
2.4 Electrical Supply:
2.5 Main Gas Valve Type & Size:
2.6 Pilot Gas Valve Type & Size:
2.7 Gas Train Serial Number:
3.0 BURNER SETTINGS
3.1 Main Burner Injector Size: mm
3.2 Pilot Burner Injector Size: mm
3.3 Are Burners & Injectors Clean?:
3.4 Kanthal Bars Fitted? (Modified & Ultimate only):
3.5* Is the Probe of the Correct Type?
3.6 Electrode Settings as Manual?
4.0 PRE-COMMISSIONING CHECKS (See Note)
4.1 Is boiler house ventilation as per manual?
4.2
Electric supply fused, isolated & earth wire
attached?
4.3 Check external controls allow operation
4.4
Check boiler/system flooded and pumps
operational and any isolation valves open
4.5 Check gas available at burner
4.6c
Check condensate trap fitted, filled and
connected to drain with air break
4.7 Check gas meter sizing adequate
4.8 Check flue system clear
5.0 COMBUSTION
Pilot Low High Unit
5.1 Gas rate
m³/hr
5.2
Main Burner
Pressure
mmwg
5.3
Pilot Burner
Pressure
mmwg
5.4*
Ionisation Probe/UV
Cell Current
uA
5.5c Air Shutter Position
-
5.6 CO2 or O2
%
5.7 CO
ppm
5.8
Gross Flue Gas
Temperature
°C
5.9 Ambient Temperature
°C
5.10 Flue Draught
mmwg
5.11
Inlet Gas Pressure (Main Burner). If
multi-boiler installation, inlet gas
pressure all boilers high fire)
mmwg
NOTE
: 5.5 to 5.9 TO BE MEASURED IN SECONDARY
FLUE 600mm UP FROM THE FLUE SOCKET OR AT
THE SAMPLING POINT PROVIDED (CONDENSING
BOILERS ONLY). THESE MEASUREMENTS ARE
INTENDED AS SAFETY CHECKS ONLY. LEVELS
ARE DEPENDENT ON FLUE DRAUGHT AND SITE
CONDITIONS AND HENCE CANNOT BE USED FOR
COMBUSTION EFFICIENCY DETERMINATION.
* FULLY ELECTRIC BOILERS ONLY
THERMO-ELECTRIC BOILERS ONLY
c CONDENSING BOILERS ONLY
§ CONVENTIONAL ATMOSPHERIC BOILERS ONLY
NOTE: It is the installer’s responsibility to ensure that the boiler is correctly commissioned by a competent engineer and that this report is completed
and kept as a record. A commissioning service available from Potterton at the address listed on the back page of this manual. When a Potterton
engineer commissions, this completed report will be sent to the installer. It is the installers responsibility to action any points arising. Commissioning
by Potterton engineers is restricted to equipment of our supply. No responsibility is accepted for the on site assembly or installation of the equipment
unless specifically carried out by Potterton. The installer must ensure that the boiler is installed in accordance with the manufacturer's instructions
and all relevant BS Codes of Practice and Regulations (see manufacturers instructions for full details). Items 4.1 to 4.6 are related to the boile
r
installation and as such these pre-commissioning checks should be carried out in the presence of the installer.
Potterton is a Member of the Boiler & Radiator Manufacturers Association (BARMA), and the terms of this Commissioning Document follow the
generally agreed conditions of the Association. Potterton, in line with its policy of continuous product development, reserves the right to alter and
amend this Document as is deemed necessary at any time.
Wood Lane, Erdington
Birmingham B24 9QP
Telephone 08706 050607 Fax 08706 001516