User guide

Installation
2Installation
2.1 SpaceRequirements
Installation plate thickness: 1.5 - 9.0 mm (0.06 - 0.35 inch)
Space requirements when installing the operator panel:
50 mm
100 mm
60 mm
304 mm
398 mm
100 mm
(4.0 inch)
100 mm
(4.0 inch)
(4.0 inch)
(2.0 inch)
50 mm
(2.0 inch)
(11.97 inch)
(15.67 inch)
(2.36 inch)
Caution:
Theopeningsontheenclosureareforairconve
ction. Donotcovertheseopenings.
2.2 InstallationProcess
1.
Unpack and check the delivery . If
damage is found, notify the supplier.
x 14
Panel cut out 355.5 x 278.5 mm
(14.0 x 10.96 inch)
Note:
Placetheoperatorpanelo nastablesurfaced uringinstallation.
Droppingitorlettingitfallmaycausedamage.
BeijerElectronics, MAEN011A
6