installation guide

- 11 -
2. Mount the junction box to the tele-
scopic arm (see rough in sketch to se-
lect proper arm) with (2) 3.9x 6mm
Flat Head Screws and (2) 3.9 mm
lock washers. Fig. 11.
3. Mount the two telescopic arms. Insert
the M6x60 lag bolts with 12.5mm
washers - mount in the two key hole
slots first (2 bolts/arm). Make sure the
arms are perpendicular to the ceiling.
Fig 12.
4. Insert the remaining four (4) lag bolts
per arm. Fig. 13.
FIG. 11
FIG. 12
FIG. 13
3.9 X 6 MM FLAT HEAD
SCREW AND 3.9 MM
LOCK WASHER
M6X60
LAG BOLTS
12.5 MM
WASHERS