Operation Manual

BFB-3000 Set Up and Operations Manual
Document No: D100253 2
1 Introduction
Thank you for purchasing your BFB-3000.
Before first use, the BFB-3000 needs careful setting up. The list below illustrates some of
the essential operations which must be carried out before operation:
Remove existing prints
Check the bed is clear of any build material
Check the bed is fitted correctly
Power up
Manual move
Check the hot-end nozzles are clean from plastic debris
Check the bed is level
Check the bed is referenced to the extruder nozzles
Load the extruders
Start a print
Print a successful raft
Print the first model
Failure to carry out all of the set-up procedures contained in this
document will damage the machine.
This document has been designed to illustrate the essential procedures and get you up and
running as quickly as possible. Please take time to understand how the process works and
complete each procedure in the order set out in this manual. Setting up can take from
20-60 minutes depending on the skill level of the operator.
Support is available by raising a ticket at www.bitsfrombytes.com
We welcome any feedback you may have, and wish you well in your 3D printing!