User manual

111
Return String:
0.050
Format:
<seconds>
PROGram:STEP:VOLTage
Description:
Configures/Queries the voltage setting for the selected
step (use PROGram:STEP command to select step).
For dual channel models, this will be for channel 1.
Syntax:
PROGram:STEP:VOLTage<SP><voltage>
PROGram:STEP:VOLTage?
<voltage> - 0 max. rated voltage.
Example:
PROG:STEP:VOLT 1.234
Set 1.234 V as voltage setting for the selected step in
the program sequence.
Query:
PROG:STEP:VOLT?
Return String:
1.234
Format:
<NRf>
PROGram:STEP:VOLT2
Note:
For dual channel models only.
Description:
Configures/Queries the voltage setting for the selected
step (use PROGram:STEP command to select step) for
channel 2.
Syntax:
PROGram:STEP:VOLT2<SP><voltage>
PROGram:STEP:VOLT2?
<voltage> - 0 max. rated voltage.
Example:
PROG:STEP:VOLT2 1.234
Set 1.234 V as voltage setting for the selected step in
the program sequence.
Query:
PROG:STEP:VOLT2?
Return String:
1.234
Format:
<NRf>
PROGram:TOTAl
Description:
Configures/Queries the total number of step numbers
for the program sequence.
Syntax:
PROGram:TOTAl<SP><number>
PROGram:TOTAl?
<number> - 2 -150 (max.)
Example:
PROG:TOTA 100
Setup a program sequence with 100 steps.