Installation guide

BlackDiamond 20808 Switch Hardware Installation Guide
89
8 Packing the BlackDiamond 20808 Chassis for
Shipping
This chapter describes how to pack the BlackDiamond 20808 chassis for shipment back to Extreme
Networks.
This chapter includes the following sections:
Required Tools and Materials on page 89
Removing the Chassis from the Rack on page 89
Assembling the Shipping Container on page 90
Required Tools and Materials
You need the following tools and materials to pack a BlackDiamond 20808 chassis:
Original shipping box and packing materials
Nut driver for disconnecting the ground wire if DC power supplies are installed
Four rack-mounting screws for attaching the helper bracket to the rack
#2 Phillips screwdriver for removing the chassis from the rack
Nylon package strapping material and a crimping tool
Removing the Chassis from the Rack
Before you begin, place the lower packing foam into the shipping pallet. Set the pallet with the foam in
a convenient, stable location near the equipment rack.
To remove the chassis from the rack:
1 To prepare the chassis for removal from the rack, remove the installed modular components:
a Turn off the power to the chassis and remove the installed power supplies.
For instructions to remove an AC power supply, see “Removing an Extreme Networks 2400 W
AC PSU” on page 63.
For instructions to remove a DC power supply, see “Removing an Extreme Networks 1900 W
DC PSU on page 70.
b Remove all the installed modules.
For instructions to remove I/O modules and management modules, see “Removing an I/O
Module or Management Module” on page 77.
For instructions to remove switch fabric modules, see “Removing a Switch Fabric Module” on
page 83.
2 Remove the air baffles from the sides of the chassis (Figure 55):
a On each baffle, use a #2 Phillips screwdriver to completely loosen the captive retaining screws at
the top and bottom of the baffle.
b Slide the baffle toward its open side to disengage the locking tabs.