Operation Manual

Attach pulley on base frame near weight stack as shown Fig 1 with ball end of cable toward weight
stack. Route cable up to low pulley of adjustable pulley block (Fig 2), then down to pulley on Base
Frame (Fig 3), up to right side pulley in Top Frame (Fig 4) and thread into the Single Pulley Block(
27)(Fig 5).
79
61
61
25
91
79
91
107
107
79
27
79
61
61
61
61
89
91
91
107
107
107
FIG 1
FIG 2
FIG 3
FIG 4FIG 5
FIG 4
FIG 2
FIG 5
FIG 3
FIG 1
CABLE ARM CONNECTING CABLE 185" (4710mm) length
10